Updates · Did you know
Check your lighting controls before the framing inspection.
Houston inspectors are now strictly enforcing 2021 IECC Section R404 requirements regarding lighting controls during the framing and insulation phase. Verifying that sensors, dimmers, and occupancy switches are correctly placed according to code prevents a failed inspection and the need for costly electrical retrofits after the walls are closed.
We manage your entire envelope sequence from concrete to paint to ensure every code requirement is met before the inspector arrives. Send plans to bids@vectorenvelope.com.
Builders and GCs: send plans and a start pace to bids@vectorenvelope.com or call (346) 595-3626 for per-plan pricing on concrete, framing, insulation, roofing and drywall & paint.