Unsealed plumbing and electrical penetrations are common failure points during 2021 IECC blower-door testing.
While framing and insulation are complete, air leaks around pipe chases and wire penetrations can trigger expensive remediation after drywall is installed. Coordinating your sealing with the same crew that handles your framing and insulation ensures these gaps are addressed before the envelope is closed.
We manage the entire sequence from concrete to paint to ensure a continuous air barrier.